Completed Project (In the last 5 years)
-
NAOC (2004)
- Port Harcourt (NIGERIA)
Diving services and Offshore Maintenance at Brass Oil Terminal and Agbara Oil Field. Drilling Platform, Production Platform, Gas Flare Buoy Operating Platform
-
ENI GAS (2005)
-
Provision & Ofshore Diving Maintenance Services At Western Libya Mellitah Terminal
-
NAOC (2005)
- Brass Oil Field, (NIGERIA)
ENIF SPM Calm Buoy Inspection and Relocation
-
NAOC (2006)
-
Standby Rescue Diving Team At NAOC Jetty
-
SAIPEM (2005)
- Bonny Island, (NIGERIA)
Provision of Diving Service for N.A.O.C. Bonny Island 36" Gas Pipeline
-
AGIP ENERGY (2005)
- Okono Field, (NIGERIA)
Top Side and Diving Survey on SPM Calm Buoy
-
SAIPEM (2006)
- Bonny Island, (NIGERIA)
Cable Fibre Optic Recovery
-
NAOC (2006)
- Nembe Creek, Bayelsa State (NIGERIA)
Diving Intervention for the 24" Ogoda-Brass Pipeline Spillage
-
NAOC (2006)
- Brass Terminal, Bayelsa State (NIGERIA)
Dredging of Fire Fighting Water Basin
-
NPDC/AENR (2006)
- OML 119, Okono/Okpoho Field
Underwater Inspection of the Calm Buoy & Offloading System.
-
NAOC (2007)
- Brass Terminal (NIGERIA)
Provision of an SPM Calm Buoy Navigational Aid
-
NAOC (2007)
- Brass Terminal (NIGERIA)
Supply of Submarine Hoses
-
NAOC (2008)
- Brass Oil Field (NIGERIA)
Charter and Operation of One (1) No. DP 2 Vessel Merlin for BOP Revamping Project
|
|
Current Projects

-
AENR (2009)
-
Duration: 6 MONTHS
Retrofit/Replacement of Sacrificial Anodes on Agara platform.(Diving Sat. System)
-
NAOC (2005)
-
Provision Of Diving And Offshore Maintenance Services And Supply Of Diving Support Vessel (DSV) For NAOC Operation Areas/Brass
-
NAOC (2007)
-
Supply of Mooring Buoy System.
-
AGIP ENERGY / NPDC NIGERIA (2007)
-
Hire And Operation Of 1 No Supply Vessel (MV Liberty) For Okono/Okpoho Field.
-
AGIP ENERGY / NPDC (2006)
-
Inspection And Maintenance Of Calm Buoy and Offloading System Inclulding ROV Services At Okono/Okpoho Platform & 16" Pipeline.
-
ENI GAS/AUGUSTA MARITIME LIBYA (2009)
-
Duration: (2 Years)
Diving Services at Mellitah terminal.
SPM Calm Bouys maintenance.
Tanker loading assitance.
-
NAOC (2009)
-
Duration: Monthly (Renewable)
Provision of Patrol Boats.
-
NAOC (2009)
-
Duration: Monthly
Provision of DP II Vessel (M/V Merlin) for intervention
-
NPDC/AENR (2007)
-
Duration: 4 Years
Supply of all spare parts needed for the Calm Buoy
System at Okono Oil Field for the duration of the
contract
-
NAOC (2009)
-
Duration: Monthly (Renewable)
Diving support Vessel AHTS(DP 1) Melody for NAOC Offshore operations.
-
MOBILPRODUCING NIGERIA UNLIMITED/PROJECT MASTER7 (2009)
-
Duration: Commenced 20/11/07 (3 Years)
Offshore Construction/Installation service contract. (Main Diving Activities include: Anode Installation on Platform Jackets, Riser Repair/Installation, General Visual Inspection.
|