Completed Project (In the last 5 years)
s
  • NAOC (2004) - Port Harcourt (NIGERIA)
    Diving services and Offshore Maintenance at Brass Oil Terminal and Agbara Oil Field. Drilling Platform, Production Platform, Gas Flare Buoy Operating Platform

  • ENI GAS (2005) -
    Provision & Ofshore Diving Maintenance Services At Western Libya Mellitah Terminal

  • NAOC (2005) - Brass Oil Field, (NIGERIA)
    ENIF SPM Calm Buoy Inspection and Relocation

  • NAOC (2006) -
    Standby Rescue Diving Team At NAOC Jetty

  • SAIPEM (2005) - Bonny Island, (NIGERIA)
    Provision of Diving Service for N.A.O.C. Bonny Island 36" Gas Pipeline

  • AGIP ENERGY (2005) - Okono Field, (NIGERIA)
    Top Side and Diving Survey on SPM Calm Buoy

  • SAIPEM (2006) - Bonny Island, (NIGERIA)
    Cable Fibre Optic Recovery

  • NAOC (2006) - Nembe Creek, Bayelsa State (NIGERIA)
    Diving Intervention for the 24" Ogoda-Brass Pipeline Spillage

  • NAOC (2006) - Brass Terminal, Bayelsa State (NIGERIA)
    Dredging of Fire Fighting Water Basin

  • NPDC/AENR (2006) - OML 119, Okono/Okpoho Field
    Underwater Inspection of the Calm Buoy & Offloading System.

  • NAOC (2007) - Brass Terminal (NIGERIA)
    Provision of an SPM Calm Buoy Navigational Aid

  • NAOC (2007) - Brass Terminal (NIGERIA)
    Supply of Submarine Hoses

  • NAOC (2008) - Brass Oil Field (NIGERIA)
    Charter and Operation of One (1) No. DP 2 Vessel Merlin for BOP Revamping Project

  Current Projects
s
  • AENR (2009) -
    Duration: 6 MONTHS
    Retrofit/Replacement of Sacrificial Anodes on Agara platform.(Diving Sat. System)

  • NAOC (2005) -
    Provision Of Diving And Offshore Maintenance Services And Supply Of Diving Support Vessel (DSV) For NAOC Operation Areas/Brass

  • NAOC (2007) -
    Supply of Mooring Buoy System.

  • AGIP ENERGY / NPDC NIGERIA (2007) -
    Hire And Operation Of 1 No Supply Vessel (MV Liberty) For Okono/Okpoho Field.

  • AGIP ENERGY / NPDC (2006) -
    Inspection And Maintenance Of Calm Buoy and Offloading System Inclulding ROV Services At Okono/Okpoho Platform & 16" Pipeline.

  • ENI GAS/AUGUSTA MARITIME LIBYA (2009) -
    Duration: (2 Years)
    Diving Services at Mellitah terminal. SPM Calm Bouys maintenance. Tanker loading assitance.

  • NAOC (2009) -
    Duration: Monthly (Renewable)
    Provision of Patrol Boats.

  • NAOC (2009) -
    Duration: Monthly
    Provision of DP II Vessel (M/V Merlin) for intervention

  • NPDC/AENR (2007) -
    Duration: 4 Years
    Supply of all spare parts needed for the Calm Buoy System at Okono Oil Field for the duration of the contract

  • NAOC (2009) -
    Duration: Monthly (Renewable)
    Diving support Vessel AHTS(DP 1) Melody for NAOC Offshore operations.

  • MOBILPRODUCING NIGERIA UNLIMITED/PROJECT MASTER7 (2009) -
    Duration: Commenced 20/11/07 (3 Years)
    Offshore Construction/Installation service contract. (Main Diving Activities include: Anode Installation on Platform Jackets, Riser Repair/Installation, General Visual Inspection.


 